A look at the projects we've mobilized — commercial high-rises, industrial buildouts, multi-family communities, and civic builds. Each one shipped under a single Division 01 contract.

500+
Sites mobilized to date
98%
On-time setup against the promised mobilization date
12M+ sf
Total commercial square footage supported
24/7
Live dispatch through every active phase
/ Selected projects

Featured
Mobilizations.

Twelve representative jobs from across our active portfolio. Add yours next.

Commercial · Office01/ Project 001

Capstone Tower

Class-A Office · Mid-Rise

Full Division 01 mobilization for a 12-story Class-A office shell — dumpsters, trailers, perimeter fencing, and temporary power coordinated under a single contract from groundbreak through TCO.

TrailersRoll-offsFencingPowerSanitation
14 moDuration
285k sfFootprint
7Phases
Industrial · Distribution02/ Project 002

Northpoint Logistics Hub

Big-Box Distribution Center

1.1M-square-foot distribution facility with phased mobilization, off-hour fueling, and sector lighting — managed across two adjacent build pads.

GeneratorsLight towersStorageTrailersFuel
22 moDuration
1.1M sfFootprint
2Pads
Multi-Family · Mid-Rise03/ Project 003

Linden Row Residences

Wood-Frame Multi-Family · 220 Units

Multi-building wrap site with rotating dumpster swaps tuned to framing and finish-trade waste rates. Privacy-screen perimeter for an active neighborhood.

Roll-offsPrivacy fenceTrailersRestroomsPatrol
18 moDuration
220Units
5Buildings
Civic · Education04/ Project 004

Westbrook Public School

K-8 New Build · Phased Site

SWPPP, BMP installation, traffic control, and pedestrian routing on an active campus — coordinated alongside school operations and dismissal hours.

SWPPPTraffic plansFencingTrailers
12 moDuration
95k sfFootprint
ActiveCampus
Healthcare · Hospital Add05/ Project 005

Meadowbrook Surgical Wing

Hospital Addition · Occupied Adjacent

Negative-air containment, HEPA filtration, and 24/7 dust-control coordination for an active-hospital addition. Vibration-monitoring and after-hours haul windows.

HEPANegative airTrailersOff-hour fuel
16 moDuration
68k sfFootprint
OccupiedAdjacent
Hospitality · Hotel06/ Project 006

Aurora Resort & Spa

Resort New Build · Remote Site

Remote-site mobilization with self-contained power, fuel logistics, and on-site security trailer for a destination resort built off the grid.

GeneratorsFuelSurveillanceTrailers
26 moDuration
340k sfFootprint
RemoteSite
Industrial · Manufacturing07/ Project 007

Caldera Manufacturing Plant

Heavy Industrial · Phased Tenant Fit-out

Tenant fit-out inside a 600k-sf manufacturing shell — heavy-duty climate, dust-control air movers, and dedicated tool cribs supporting a 24/7 build schedule.

HVACAir moversTool cribGenerators
10 moDuration
600k sfShell
24/7Schedule
Commercial · Mixed-Use08/ Project 008

The Foundry District

Mixed-Use Block · Retail + Residential

Full-block mixed-use redevelopment with phased perimeter rotation, sidewalk-closure pedestrian routing, and a single shared mobilization yard.

PedestrianPhased fenceTrailersRoll-offs
28 moDuration
410k sfFootprint
BlockClosure
/ By Sector

Where We
Work.

Our service catalog flexes by sector. Phased multi-family looks nothing like a cleanroom build, and our delivery rhythm adapts.

/ 01

Commercial

Office, retail, and mixed-use builds. From single-pad mid-rise to full-block redevelopment.

160projects
/ 02

Industrial

Distribution, manufacturing, cold storage, and data center support — high-load, high-tempo sites.

95projects
/ 03

Multi-Family

Wood-frame and podium multi-family across garden, mid-rise, and high-rise typologies.

130projects
/ 04

Civic & Healthcare

Schools, hospitals, government, and public-works projects with active-occupancy coordination.

115projects
"Phase change to phase change, we never renegotiated a thing. SSP just kept the site running."
— Senior Superintendent · Multi-Family GC

Add Your
Project to
the List.

If you're scoping a new build, a phased reno, or a remote-site mobilization, drop us the basics and we'll come back inside 24 hours.